The Capital Readiness Review™

A phase-gate framework that sequences the household balance sheet for Aerospace & Defense and high-tech professionals: built on the same phase-gate review logic used to certify a system before it goes to production.

Four phases. Eight gates. Defined criteria instead of opinions.

The Problem This Solves

Most planning advice is a checklist of good ideas with no ordering. Sequence is usually what fails, not instrument selection: a private-market commitment made before liquid reserves exist, or a complex tax structure layered over unresolved high-interest debt. Technical professionals are handed unusually rich benefit menus and unusually many simultaneously plausible next moves. The question worth answering is which decision does not depend on something still unverified.

How It Works

Three Controls, No Opinions

Gate criteria

Written in advance, so the standard does not move to fit a decision already made.

Key Verification Parameters

Measurable checks against a statement, policy, or pay stub, not judgment calls.

Go / No-Go

A recorded decision, with the specific failed parameter identified when status is red.

Red Status, Stated Plainly

If a household wants to commit to private equity before funding reserves and income protection, Gate 4.0 returns red: the decision becomes objective.

Four Phases // Eight Gates

The Gates in Order

One line per gate. A gate opens only when its criterion is verified.

PHASE 01 // FOUNDATIONAL DESIGN REVIEW

Foundational Design Review

1.0

Cash flow stability

Verified positive cash flow over a rolling 90-day window.

2.0

Employer match and benefits

Capture 100% employer match, replace high-fee defaults, audit baseline beneficiaries.

PHASE 02 // CRITICAL DESIGN REVIEW

Critical Design Review

3.0

High-interest debt

Eliminate non-mortgage liabilities above roughly 7-8% via automated avalanche sweeps.

4.0

Operating margin and risk transfer

Three to six months cash reserves in Treasury vehicles, paired with own-occupation disability and umbrella liability protection.

PHASE 03 // SYSTEM VERIFICATION REVIEW

System Verification Review

5.0

Tax-advantaged maximization

Triple-tax-advantaged HSA, coordinated FSA/529 plans, clean Backdoor and Mega Backdoor Roth conversions.

6.0

Asset location and taxable brokerage

Multi-account asset location, direct indexing loss harvesting, scheduled employer stock de-risking, and DAF charitable gifting.

PHASE 04 // FULL-RATE PRODUCTION AND SUSTAINMENT

Full-Rate Production and Sustainment

7.0

Alternatives and private markets

5x liquid net worth coverage and dedicated capital call cash buffer verified before any commitment.

8.0

Estate architecture and transfer

Synchronized foundational estate baseline (Trust/Will/DPOA), concentrated stock CRUT transfer, and advanced irrevocable trust modeling.

Who This Is For

Framed by Stage, Not Net Worth

The Accumulator

Early to mid-career, building the foundation.

Cash flow discipline, match capture, debt payoff, cash reserves, and income protection.

Focus: Gates 1.0-4.0

The Optimizer

Mid-career with meaningful taxable assets and no high-interest debt.

Roth pipeline mechanics, FSA/529 coordination, asset location, RSU de-risking, and direct indexing tax alpha.

Focus: Gates 5.0-6.0

The Legacy Architect

Later career, concentrated equity positions, thinking about multi-generational transfer.

Illiquidity controls, charitable remainder unitrusts, and estate architecture.

Focus: Gates 7.0-8.0

Engagement and Fees

Two Mandates, Stated Up Front

Integrated financial planning to map and certify the gates, plus investment management to execute the portfolio mechanics.

Investment management is 0.75% of assets under management annually, billed monthly in arrears. Planning is available as ongoing wealth planning or as a focused project-based engagement.

Form ADV Part 2Full Fee Schedule

What Happens First

Three Steps to a Status Report

01

Discovery and baseline certification

We map your current picture against all eight gates and issue a red/yellow/green status report.

02

First 30 days

Activate Gates 1 and 2.

03

Quarterly

Re-check parameters, update status, frame the next go/no-go decision.

Operational Flight Plan

Ready to see how this framework operates in practice?

The Client Experience page describes the journey of working together. This page describes the standard your balance sheet is measured against.

Explore Client Experience